🔧 Edger

Service Log #4

← Back to list

Job Details

Mobile / Unit
GM1
Service Date
2026-07-16
Location
JOHANESBURG
Technician
NJABULO MABUZA
Machine Brand
COT
Machine Model
COT PLE900
Serial Number
TST10/07/26

Before You Start — Photos

After Service — Photos

Compare against the "before" photos above to confirm the equipment was cleaned.

Damage Assessment
CheckConditionComments
Check for visible damage to grinding wheels. OK
Inspect water pump housing and fittings for cracks or leaks. OK
Assess condition of scanner for scratches or lens cracks. OK
Inspect cables and connectors for fraying or disconnection. OK
Check internal compartments for missing or loose components. OK
Evaluate display panel or control buttons for signs of damage. OK
Confirm machine housing is intact without major dents or damage. OK
Service Checklist
TaskDoneComments
Check and clean grinding wheels for wear and debris buildup. Yes
Inspect and clean the water pump; ensure proper flow and no blockages. Yes
Remove lens residue from grinding area and internal compartments. Yes
Perform alignment calibration of the edger (horizontal and vertical alignment). Yes
Cleaning of lens scanner. Yes
Calibrate lens shape scanner and confirm shape accuracy. No
Check for damaged parts (e.g., wheels, sensors, hoses) and replace if necessary. No
Lubricate moving parts if required. No
Run test grind and inspect output accuracy. No
Clear software errors or perform firmware update (if applicable). No
Post-Service Functionality Check
CheckResultComments
Grinding wheels operate smoothly and cut correctly. Pass
Water pump runs with proper flow and no leaks. Pass
No lens residue remains in or around the grinding area. Pass
Edger alignment is accurate (confirmed by test run). Pass
Scanner reads shapes accurately and matches input. Pass
No unusual sounds, vibrations, or error codes present. Pass
Machine body and interface cleaned and reassembled properly. Pass

Notes & Sign-off

CHANGE WHEELS IN THE NEXT SERVICE

Technician Signature
N
Technician Sign-off Date
2026-07-20
Supervisor Signature
I
Supervisor Sign-off Date
2026-07-20